Skip to main content
Loading…
This section is included in your selections.

A. The following specific site conditions shall be considered for each wall design and noted on the drawings submitted:

1. Future structures and landscaping.

2. Location of utilities, utility easements, and written permission in a form acceptable to the city from each affected utility to construct the wall. Notwithstanding any written permission, the city reserves the right to deny a permit for a wall within, or over, a utility easement.

3. Location of existing or future utility installations within eight feet (8') of the base and top of wall.

4. Data showing the subgrade soil conditions within eight feet (8') of the wall.

5. The type of fill material to be replaced or removed.

6. The drawings shall note the drainage for surface water within sixteen feet (16') of the wall, and all walls shall be designed assuming wet conditions.

7. The drawings shall note the subsurface water conditions within eight feet (8') of the wall.

8. The drawings shall note the keyway/foundation depth and width.

9. The drawings shall note the slope conditions and surcharge loads.

10. Maintenance and service access. (Ord. 2019-10-002, 10-10-2019)